Hardcore Luxury® -- Always 100% USA

Start to Finish

How long does it take to make a WeatherWool garment, from start to finish? A year to a year-and-a-half, but that's just the WeatherWool part. The Ranchers start their work years before we do!

This page presents the main steps and the timeline. A separate page, How WeatherWool is Made, details each of these steps and many others, and introduces the many companies and professionals that help in the process.

  1. In Spring of each year our Ranchers examine the performance records of each ewe and determine which ram will be a suitable sire for her next lambs. This process begins in June. Click for some photos and discussion of these events on PM Ranch in Minnesota in 2018.
  2. Nearly a year later, in late April or May (on PM Ranch), lambs are born. [Let's say 1 year has passed.]
  3. When the lambs are almost one year old, they are shorn for the first time. Normally, the wool grown in a sheep's first year is finer (thinner) than the wool grown later in life, and so ewes that have been bred for us often do not produce fiber we can use at their first shearing. But we do sometimes buy lamb's wool. [Two years have passed.]
  4. When the grown lamb is a 2-year old ewe, it is shorn again, and this will usually be the first time it will produce fiber that we can use. [Three years have passed.]
  5. A few things have to happen before we actually can take possession of the wool. The fleece must be:
        • baled
        • transported to Roswell Wool in New Mexico, although we have begun to source wool from Wyoming that does not go through Roswell
        • greasy (raw) wool must be sampled for testing ... at Roswell or in Wyoming
        • samples sent to the lab. The testing is done at the New Zealand Wool Testing Authority because the USA's only lab that did all the tests we need closed in 2019. The University of Texas did some testing for us as of 2023, but the "length and strength" testing still was in NZ.
        • Test results returned to Roswell and to us. We have a login at NZWTA, so we can see online all the results for the batches we are considering for purchase
        • Roswell compiles the auction materials (information on the origin and size of each lot of wool and all the test results)
        • Roswell holds the auction
        • We hopefully win the clips we seek. Sometimes we will purchase our fiber by Private Treaty prior to the auction
        • WeatherWool pays for the wool. This is when WeatherWool begins to incur costs, and we are responsible for all the costs hereafter.  We also pick up the costs for testing of the fiber we buy
      These several items regarding the purchase of the raw fiber are accomplished rather quickly, about six weeks, but let's say one month. [Three years and 1 month have passed.]
              
      Although three years have elapsed since our Ranchers began planning, we'll start our own clock from this point, when we first start spending money
        
      6. Now the wool must be trucked to Chargeurs in South Carolina, where it is scoured (cleaned) and combed into TOP.  plant , scoured, scouring costs settled, and shipped where it needs to go. Depending on exactly what we are making, the top might be shipped to other companies for dyeing or worsted spinning.  But mostly we will ship to American Woolen. This will take about three months or so. [3 months have passed.] but in 2024 in might be only a four-six weeks.
      7. American Woolen and WeatherWool (and sometimes Rob Stuart, our Advisor and original Fabric Engineer), decide what Fabrics will be made, and discuss how the fiber needs to be prepared, then American Woolen apportions the fiber as needed. This will take a month or so. [4 months.]
      8. American Woolen sends our fiber to the dye house, Tintoria Piana, in Georgia.  When possible we will from Chargeurs directly to Tintoria, because that will save significant time and money. Tintoria requires three months for dyeing. [7 months.]
      9. Kentwool (worsted) spins our warp yarn, and American Woolen prepares, blends and (woolen) spins the weft yarn. This will take at least two months, probably three months or longer. [10  months.]
      10. The yarn is spun into loom-state Fabric at Material Technology and Logistics and the loom-state Fabric is returned to American Woolen. Weaving will take two or three months or even six months, depending on the Batch size. It's a very slow process. But the loom-state will be shipped to AWC in tranches.  We won't have to wait for it all at once. Let's say three months. [13 months.]
      11. The loom-state Fabric is finished at American Woolen. About another month or two or even several, again depending on Batch size and whatever other work AWC has on the docket. Let's say two months. [15 months.]
      12. The finished Fabric is sent to Better Team USA and Factory8, both of which make garments for several other companies. At least two months and maybe quite a bit longer. Let's say three months. [18 months have now elapsed.]
      13. ALSO ... Tailors or Hat Makers may be booked months in advance, and may require that all our materials are in their possession BEFORE they actually book production time. This requirement can add more months to our production cycle.
             

      All told, a  good four-and-a-half years from planning the breeding of a ewe and ram to a finished garment made from the fleece of their offspring. And about 18 months from when WeatherWool gets involved until we have finished garments.

      This timeline can be further dilated by downtime. The scouring plant, the dyers, the tailors, the spinners, the weavers, the finishers … all of these pros are serving many other customers and so we may need to wait weeks or more before they are ready to work on WeatherWool. Or there may be personnel or equipment problems that cause delays. Much of the garment industry shuts down for a week or two in July.

      The timeline also does not include potential supply-chain bottlenecks. Because some of our supplies, such as zippers and thread and buttons may have a lead time of months, we need to keep large surpluses on hand in order to be sure our operations are not held up.

      Our Ranchers will begin working on WeatherWool more than three years before they actually get paid. And WeatherWool will be out of pocket for about 18 months before we have finished garments. That is, it takes a year-and-a-half from the time we purchase raw wool from the Ranchers until our customers purchase finished garments.

      This sounds like (and certainly FEELS like!) a very long time to me, but I don't have any other frame of reference.

      As WeatherWool grows, we will be working more and more closely with our Ranchers and all our Partners.

      There are still other significant wrinkles in the production.  When MTL does the weaving, each different color and Fabric requires significant preparation time.  So, MTL wants to do an entire run of each Fabric before beginning the next.  However, the tailors want exactly the opposite.  We make Anoraks, for example, in eight different Fabrics.  The tailors wants all eight Fabrics at once ... exactly the opposite of the way MTL needs to weave them.  This is incompatibility is a huge issue for us.

      THANKS to Advisor Bob Padula for the Rancher-section of the timeline.

       

      26 February 2024 --- Ralph